FLORIDA BUILDING PERMIT GUIDE
- Aug 3
- 8 min read

Florida Building Permit Drawings
If you're planning to build, remodel, or add onto a home in Florida, one of the first things you'll likely need is a complete set of building permit drawings.
Whether you're building a room addition in Orlando, converting a garage in Tampa, installing a new lanai in Naples, or constructing a custom home in Jacksonville, your local building department will typically require construction drawings before issuing a permit.
Although Florida uses statewide building codes, permits are reviewed and approved by local cities and counties. That means the exact requirements for your project may vary depending on where it's located.
At Draft My Plans, we prepare permit-ready residential drawings for homeowners, contractors, and real estate investors throughout Florida. Our goal is to produce clear, accurate plans that satisfy local building department requirements while making the permitting process as smooth as possible.
What Are Building Permit Drawings?
Building permit drawings are the technical plans submitted to your local building department for review before construction begins.
These drawings show how the project will be built, allowing plan reviewers to verify that it complies with applicable building codes, zoning regulations, structural requirements, and safety standards.
A permit set is much more than a simple floor plan. Depending on the scope of work, it may include structural information, foundation details, framing layouts, elevations, sections, energy documentation, and other information needed for plan review.
What Projects Usually Require Permit Drawings in Florida?
Most structural or permanent improvements require building permits, and those permits usually require construction drawings.
Some of the most common residential projects include:
Room additions
Home additions
Garage conversions
Accessory Dwelling Units (ADUs)
Guest houses
Detached garages
Workshops
Carports
Patio covers
Lanais
Screen enclosures
Pergolas
Covered patios
Structural remodels
Removing load-bearing walls
New windows and exterior door modifications
Roof structure modifications
New custom homes
Duplexes and residential developments
Smaller cosmetic improvements, such as painting, flooring, cabinetry, or replacing finishes, may not require permit drawings, but structural work almost always does.
If you're unsure whether your project requires a permit, it's best to verify with your local building department before beginning construction.
What Is Typically Included in a Permit Drawing Set?
Every project is different, but a typical residential permit package may include several types of drawings depending on the scope.
Site Plan
The site plan shows where the proposed construction will be located on the property.
It typically identifies:
Property lines
Existing structures
Proposed construction
Building setbacks
Driveways
Easements
Distances to property lines
North arrow
Lot dimensions
Many jurisdictions require a current property survey before a site plan can be completed accurately.
Existing & Proposed Floor Plans
Floor plans are usually the foundation of the entire drawing set.
They show:
Room layouts
Wall locations
Doors
Windows
Dimensions
Room names
Plumbing fixtures
Cabinet layouts
Stair locations
For remodels and additions, permit drawings often include both existing and proposed floor plans so reviewers can clearly understand the changes being made.
Foundation Plan
The foundation plan shows how the structure will be supported.
Depending on the project, this may include:
Slab dimensions
Footings
Stem walls
Foundation reinforcement
Pier locations
Anchor bolts
Hold-downs
Foundation notes
Florida's soil conditions can vary considerably from one area to another, so foundation requirements may differ depending on the project location.
Roof Plan
Roof plans illustrate:
Roof slopes
Ridge locations
Valleys
Hips
Roof overhangs
Drainage direction
New versus existing roof areas
Projects involving additions often require careful coordination between the existing roof and the new structure.
Exterior Elevations
Exterior elevations show what the completed project will look like from each side.
These drawings commonly include:
Building height
Exterior finishes
Roof pitch
Window locations
Door locations
Grade lines
Overall appearance
Building departments frequently use elevations to verify zoning compliance and building height limitations.
Building Sections
Sections are cut-through views of the structure.
They help explain construction details that cannot easily be shown on floor plans.
Sections often illustrate:
Foundation connections
Wall framing
Roof framing
Ceiling heights
Insulation
Floor assemblies
Structural connections
Structural Details
Structural sheets explain how the building will safely support required loads.
Depending on the project, these drawings may include:
Beam details
Header sizes
Connection details
Hurricane straps
Hold-downs
Anchor bolts
Framing details
Roof connections
Post connections
These details become especially important for additions, patio covers, screen enclosures, and projects involving large openings.
Electrical, Mechanical & Plumbing Layouts
Some projects require additional layouts showing:
Lighting
Receptacles
Smoke detectors
HVAC equipment
Exhaust fans
Plumbing fixtures
Water heater locations
Mechanical ventilation
The required level of detail depends on both the project scope and local jurisdiction.
Energy Code Documentation
Many residential additions and conditioned spaces require energy compliance documentation.
Depending on the project, this may include:
Insulation values
Window specifications
HVAC information
Building envelope details
Energy calculations
Florida places significant emphasis on energy efficiency for conditioned living spaces.
Florida Building Requirements That Affect Your Plans
Florida has several construction requirements that are more significant than in many other states.
Understanding these early helps avoid plan review comments later.
Hurricane Wind Design
Florida experiences some of the highest design wind speeds in the United States.
Because of this, building departments pay close attention to structural connections and wind resistance.
Plan reviewers commonly evaluate:
Roof framing
Roof sheathing attachment
Hurricane straps
Structural connectors
Beam sizing
Roof-to-wall connections
Continuous load path
Foundation anchorage
Uplift resistance
Outdoor structures like pergolas, patio covers, detached garages, and screen enclosures often require additional structural review because they are highly exposed to wind forces.
Flood Zones
Many Florida properties are located within FEMA flood zones.
Depending on the property's location, permit applications may require additional information such as:
Finished floor elevations
Flood zone verification
Elevation certificates
Flood-resistant construction methods
Foundation elevations
Utility elevations
If your property is located in a flood hazard area, these requirements should be addressed early in the design process.
High Water Tables
In many parts of Florida, groundwater is located relatively close to the surface.
This can affect:
Foundation design
Drainage
Footing construction
Excavation methods
Site grading
Some projects may require additional engineering depending on soil conditions and groundwater levels.
Energy Efficiency
Florida requires compliance with modern residential energy codes.
For many projects, reviewers verify:
Insulation
Window performance
Exterior doors
Air sealing
HVAC efficiency
Building envelope requirements
Proper documentation helps reduce plan review delays.
Drainage & Site Grading
Because Florida receives substantial rainfall throughout the year, drainage is an important part of many permit reviews.
Building departments may review:
Site grading
Roof drainage
Swales
Water runoff
Drainage direction
Finished grades
Proper drainage helps protect both the new construction and neighboring properties.
Do I Need a Structural Engineer?
Not every residential project requires a structural engineer, but many do.
Projects that commonly require structural engineering include:
Large room additions
Removing load-bearing walls
Second-story additions
Large beam installations
Screen enclosures with long spans
Custom homes
Elevated foundations
Coastal construction
Projects with unusual structural conditions
For smaller projects, prescriptive framing methods allowed by the residential code may be sufficient.
When engineering is required, we coordinate with licensed structural engineers as part of the permitting process.
How Long Does the Permit Process Usually Take?
Permit timelines vary considerably depending on the city, county, and complexity of the project.
A typical process often looks like this:
Step 1 — Gather Project Information
This includes photos, measurements, surveys, sketches, HOA requirements, and any information received from the building department.
Step 2 — Prepare Construction Drawings
Permit drawings are created based on the proposed design and applicable building codes.
Step 3 — Submit to the Building Department
The plans are submitted for plan review.
Some jurisdictions allow online submissions, while others still require additional documentation.
Step 4 — Plan Review
Reviewers evaluate the drawings for:
Building code compliance
Structural requirements
Zoning
Floodplain regulations
Energy code
Life safety
Step 5 — Corrections (If Needed)
It is completely normal to receive review comments.
Most projects require at least one round of revisions before approval.
Step 6 — Permit Approval
Once comments are resolved, the permit can be issued.
Step 7 — Construction & Inspections
During construction, inspectors verify that the work matches the approved permit drawings.
Common Reasons Permit Plans Get Rejected
Receiving corrections does not necessarily mean the drawings were poorly prepared.
Many jurisdictions routinely issue review comments.
Some common reasons include:
Missing dimensions
Incomplete site plans
Incorrect setbacks
Missing structural details
Beam sizes not identified
Incomplete framing information
Missing connector details
Energy documentation errors
Missing notes
Conflicting information between sheets
Incomplete foundation details
Missing product approvals when required
Responding quickly and accurately to review comments usually keeps the project moving.
Do I Need an Existing Survey?
Many Florida jurisdictions require a property survey before permit approval, especially for:
Additions
Detached structures
New homes
Pools
Garages
Accessory buildings
A survey helps verify:
Property boundaries
Existing structures
Easements
Setbacks
Utility locations
If you already have a recent survey, it can significantly simplify the permitting process.
What If I Live in an HOA?
Many Florida neighborhoods are governed by Homeowners Associations (HOAs).
HOA approval is separate from the building permit process.
In many communities, you'll need approval from the HOA before construction begins.
HOA review may evaluate:
Exterior appearance
Roof materials
Paint colors
Building size
Setbacks
Landscaping
Fencing
Obtaining HOA approval early can help avoid delays later.
Florida Cities We Commonly Work In
We prepare permit drawings for residential projects throughout Florida, including:
Miami
Orlando
Tampa
Jacksonville
Fort Lauderdale
Naples
Sarasota
Cape Coral
St. Petersburg
Fort Myers
Tallahassee
Gainesville
Pensacola
Clearwater
Boca Raton
West Palm Beach
Lakeland
Kissimmee
As well as surrounding cities and counties across the state.
Frequently Asked Questions
Do I always need permit drawings?
Not always. Minor cosmetic work may not require permits, but structural work, additions, garages, patio covers, and most permanent improvements typically do.
Can I draw my own permit plans?
Some Florida jurisdictions allow homeowners to prepare their own plans for projects on their primary residence. However, the drawings must still meet the building Department's requirements, and many projects require engineering or other supporting documents.
How long does plan review take?
Review times vary by jurisdiction and workload. Some smaller projects may be reviewed within a few days, while larger or more complex projects can take several weeks.
Will I need structural engineering?
It depends on the project. Many structural modifications, large additions, long-span beams, and coastal projects require engineering.
Can construction begin before the permit is approved?
No. Construction should generally not begin until the permit has been issued by the local building department.
What happens if I receive plan review comments?
Plan review comments are a normal part of the permitting process. The requested revisions are made, resubmitted, and reviewed again until the project satisfies the building department's requirements.
Why Choose Draft My Plans?
We specialize in preparing residential permit drawings designed specifically for the permitting process.
Whether you're a homeowner building an addition, a contractor managing multiple projects, or an investor renovating properties throughout Florida, we work to produce clear, permit-ready drawings that simplify plan review and help keep your project moving.
We assist with projects ranging from small patio covers and garage conversions to custom homes, additions, detached structures, and complete residential permit sets.
Start Your Florida Permit Project
If you're planning a residential construction project in Florida, we'd be happy to help.
Simply send us:
Your project address
A brief description of the work
Photos of the existing structure
Sketches or existing plans (if available)
Your property survey (if available)
Any requirements you've already received from your city or county
We'll review your project, explain what's typically required for permitting, and help you prepare a complete set of permit-ready construction drawings for your local building department.